The problem: demand peaks at the terminal
A logistics terminal uses energy unevenly: gates, conveyors and cold storage run during the day, while the e-truck fleet returns in the evening and charges simultaneously before morning departures. When everything runs at once, demand exceeds the contracted capacity – meaning overrun penalties or an expensive grid connection upgrade.
An upgrade is not only about cost: in many locations the grid operator has no spare capacity at all, and waiting for new connection terms is measured in years.
What an EMS does at a terminal
An energy management system (EMS) controls the site's power draw in real time. At a terminal it combines data from chargers, battery storage, the PV installation and the fleet schedule, then allocates the available power limit so it is never exceeded.
- dynamic allocation of charging power to every vehicle
- priority for vehicles with the earliest departures
- charging the battery in low-price hours and discharging at peak
- using on-site PV energy instead of grid import
- continuous enforcement of the contracted power limit
Charging aligned with the fleet schedule
The key is integrating the EMS with the TMS or departure schedule. The system knows which vehicles leave first and how much energy they need, so it plans charging in departure order. A truck leaving at 4:00 charges before one leaving at 8:00 – even if they were plugged in the other way round.
The role of battery storage and PV
Battery storage smooths the peaks: it charges when terminal demand is low or energy is cheap, and discharges when the fleet charges hardest. Rooftop PV reduces daytime grid import. The EMS coordinates both resources with charging, maximising the use of on-site energy.
What you can gain
In practice, power control lets you connect significantly more chargers within the existing connection – without changing the contract with the grid operator. Capacity charges and energy costs also drop, because charging shifts to the cheapest hours. The exact effect depends on the fleet schedule, the power limit and the site configuration – it is worth calculating on your own data.
How Go2EV approaches terminals
Go2EV Depot is an optimisation engine that controls many vehicles and sites in real time under one shared power limit. We integrate it with chargers (OCPP), the TMS, battery storage and PV, and reports show the actual savings. We start with a site audit and a pilot at one terminal.