Vehicles ready to depart
Charging follows TMS and the timetable. Whoever leaves first charges first.
Go2EV Depot
Go2EV controls chargers, PV and battery storage at your site: more vehicles on your existing connection, lower energy bills and extra revenue from flexibility.
Apply for the pilotWhat logistics centre, terminal and e-bus depot operators — and their tenants — gain.
Charging follows TMS and the timetable. Whoever leaves first charges first.
Fewer power peaks and lower capacity charges, charging in the cheapest hours based on TGE prices, more own energy from PV and storage.
Storage charged cheaply and discharged in expensive hours. From 2030, site flexibility sold through an aggregator, with no work on the hub's side.
More chargers within existing capacity. The EMS keeps to the limit, so no overrun penalties.
Problem
Depots need megawatts now. Today neither the depot operator nor the grid operator controls energy on site.
A truck hub needs several, eventually a dozen or more MW. Connections take years and power peaks raise bills.
Fleet charging concentrates under the same stations. Upgrades are expensive and slow.
Chargers, PV and storage run separately. The grid operator has no access to them.
Chargers don't know the vehicle schedule or route. Trucks and buses wait for energy and trips get delayed.
Technology
Inputs
Go2EV Depot
Real-time optimisation of many vehicles and sites under one shared power limit
Outputs
The hard part: fixed departure times, uncertain arrivals and PV, and one limit shared by several sites.
The fleet returns in the evening and leaves at dawn. Rooftop PV, storage and several tenants under one transformer station.
The whole fleet charges overnight and leaves on timetable. An uncharged bus means a cancelled trip.
Works today
In development
We are looking for logistics centres, e-bus depots and grid operators who want to test energy control at a single site.
Go2EV Depot plans charging for electric bus and truck fleets at depots and terminals. Charging schedules are matched to route plans and grid connection limits. It is available as a pilot programme.
Often, yes. Go2EV Depot distributes power between vehicles according to departure times and available capacity (load balancing), so the existing connection can serve more vehicles without exceeding contracted power.
We read route plans and departure times from the TMS so every vehicle reaches the required state of charge before it leaves. The integration is adapted to the operator's system.
Yes. The charging schedule can use PV production and battery storage to reduce peak demand and grid energy costs.
Electric bus operators, truck and delivery fleets, transport terminals and logistics hubs that charge many vehicles at one site.
Go2EV Depot is priced individually as an estimate, depending on the number of vehicles and chargers, integrations and the scope of the pilot.
Describe your infrastructure and needs. We'll get back to you by email.