Go2EV
    Pilot programme

    Go2EV Depot

    Depots, terminals and logistics centres optimised for energy use and trading

    Go2EV controls chargers, PV and battery storage at your site: more vehicles on your existing connection, lower energy bills and extra revenue from flexibility.

    Apply for the pilot
    power limit

    Savings and revenue for your site

    What logistics centre, terminal and e-bus depot operators — and their tenants — gain.

    Vehicles ready to depart

    Charging follows TMS and the timetable. Whoever leaves first charges first.

    Lower energy bills

    Fewer power peaks and lower capacity charges, charging in the cheapest hours based on TGE prices, more own energy from PV and storage.

    Energy trading and extra revenue

    Storage charged cheaply and discharged in expensive hours. From 2030, site flexibility sold through an aggregator, with no work on the hub's side.

    No waiting for a new connection

    More chargers within existing capacity. The EMS keeps to the limit, so no overrun penalties.

    Problem

    Fleets electrify faster than the grid optimises

    Depots need megawatts now. Today neither the depot operator nor the grid operator controls energy on site.

    Grid connections too small

    A truck hub needs several, eventually a dozen or more MW. Connections take years and power peaks raise bills.

    Overloaded transformer stations

    Fleet charging concentrates under the same stations. Upgrades are expensive and slow.

    Systems in silos

    Chargers, PV and storage run separately. The grid operator has no access to them.

    Charging detached from routes

    Chargers don't know the vehicle schedule or route. Trucks and buses wait for energy and trips get delayed.

    Technology

    An optimisation engine from site to transformer station

    Inputs

    • Battery state and vehicle departure time
    • Fleet schedule or timetable
    • PV forecast and storage state
    • Day-ahead energy prices
    • Power limit for the grid node

    Go2EV Depot

    Real-time optimisation of many vehicles and sites under one shared power limit

    Outputs

    • Charging power for every vehicle
    • Storage charge and discharge plan
    • Flexibility report for the aggregator and grid operator

    The hard part: fixed departure times, uncertain arrivals and PV, and one limit shared by several sites.

    Two kinds of depots, one engine

    Logistics centre

    e-trucks

    The fleet returns in the evening and leaves at dawn. Rooftop PV, storage and several tenants under one transformer station.

    • Fleet charging within the existing connection
    • Lower peak costs thanks to PV and storage

    E-bus depot

    market ready today

    The whole fleet charges overnight and leaves on timetable. An uncharged bus means a cancelled trip.

    • Every bus ready for its first trip

    Works today, developing to 2030

    Works today

    • CPMS on OCPP 1.6J
    • Failure prediction and service log
    • Dynamic tariffs
    • Off-grid charging stations

    In development

    1. 2027Site power limits, fleet management, TMS integration
    2. 2028OCPP 2.0.1 certification; EMS v1 at a logistics park and first depots
    3. 2029EMS v2 for site groups; ISO 15118-2 Plug&Charge; MCS
    4. 2030ISO 15118-20, V2G readiness, OCPP 2.1

    Join the pilot programme

    We are looking for logistics centres, e-bus depots and grid operators who want to test energy control at a single site.

    Frequently asked questions

    What is Go2EV Depot?

    Go2EV Depot plans charging for electric bus and truck fleets at depots and terminals. Charging schedules are matched to route plans and grid connection limits. It is available as a pilot programme.

    Can I charge more vehicles without upgrading the grid connection?

    Often, yes. Go2EV Depot distributes power between vehicles according to departure times and available capacity (load balancing), so the existing connection can serve more vehicles without exceeding contracted power.

    How does Go2EV Depot work with a fleet management system (TMS)?

    We read route plans and departure times from the TMS so every vehicle reaches the required state of charge before it leaves. The integration is adapted to the operator's system.

    Does Go2EV Depot use solar PV and battery storage?

    Yes. The charging schedule can use PV production and battery storage to reduce peak demand and grid energy costs.

    Which fleets is Go2EV Depot for?

    Electric bus operators, truck and delivery fleets, transport terminals and logistics hubs that charge many vehicles at one site.

    How much does Go2EV Depot cost?

    Go2EV Depot is priced individually as an estimate, depending on the number of vehicles and chargers, integrations and the scope of the pilot.

    Let's talk about your infrastructure

    Describe your infrastructure and needs. We'll get back to you by email.

    We usually reply within 24 hours on business days.